cyclo gearbox and cyclo gear motor for replacement of sumitomo cyclo drive gear reducer

Quick Details


Gearing Arrangement: Cycloidal
Output Torque: 3.2-18000N.m
Rated Power: 0.12-200kW
Input Speed: 300-1800Rpm
Output Speed: 0.16-1028r/min
Color: Blue

 

Appearance and installation dimension


Frame
Center
height
 Installation dimension
 Outer side dimension
A1
A0
B1
B0
h
s
Hole
 Output shaft
 Input shaft
n
d0
d1
b1
c1
l1
d2
b2
c2
l2
130
160
78
200
75

340

25
M12
4
17
55
16
59
80
15
5
17
22
131
18
6
20.5
35
141
200
53
320
80
22
70
20
74.5
102
152
240
39
380
420
32
M16
90
25
95
120
22
24.5
40
153
30
8
33
55
163
290
45
480
90
560
35
M20
26
100
28
106
140
174
325
80
500
120
630
40
30
120
32
127
165
35
10
38
60
184
420
122
330?
160
800
50
2-M20
6
32
140
36
148
210

(mm)

Frame
Outer side dimension
kg
A
B
H
D
Double Shaft style
Flange style
L
L1
L2
130
250
390
356
300
414
367
According
to motor size
82
131
448
383
100
141
380
400
425
340
519
447
153
152
440
470
529
430
633
552
245
153
666
566
265
163
560
620
614
500
755
655
460
174
600
690
706
580
860
750
710
184
810
880
883
710
1077
959
1270

 

Why Choose Us


We Consider Our Customers as Our Friends and Families, and We do Believe in the Win-Win Situation for Building up Long-Term Relationship.
- Innovation
Provide durable, high efficiency stable products and services.
- Quality
Deliver consistently superior performance and pursue every possible improvement.
- Environment
Be a responsible citizen that makes a difference by helping build and support sustainable communities. our manfucature plant passed thorugh ISO14001
- Customer Satisfaction
Anticipate customer needs and exceed their expectations in affordability, quality and on-time delivery.

 

FAQ


Q:What's the voltage of your motor?
220/380V/660

Q:What's the frequency of your motor?
50HZ or 60HZ

Q:What'a the phase of the motor?
Single phase or three phase as your required.

Q:What's the mounting size of your motor?
Design as customer required.

Q: Do you offer OEM service?
A: Yes.

Q: What is your payment term?
A: 50% T/T in advance,50% before delivery. Or irrevocable L/C.

Q: What is your lead time?
A: About 10-45 days after receiving deposit or original L/C.

Q: What certificate do you have?
A: We have CE, ISO9001,CCC ,EX and so on.

,